Skip to content

ICPS Gateway Wetlab

October 5, 2018

(A)(1) Option 1 place the ICPS into a DRO around the moon for storage for later use. (A)(2)Option 2 Orion does a TD&E maneuver with its ICPS stage after TLI with a Nanoracks docking unit

Close relationship to the ACES/SEP PPE gateway propulsion unit post,

https://yellowdragonblog.com/2018/09/14/dimensions-and-volume-of-a-cryogenic-zenon-sep-propellant-tank/

 

Apollo11-04Apollo11-03

From → Uncategorized

One Comment
  1. rappolee58's avatar

    test test

    Like

Leave a reply to rappolee58 Cancel reply